Combining Robust Analysis and Fuzzy Screening to Develop a Robust Strategic Planning Model for Service Logistics Network; a Case of Shiraz Electric Distribution Co.

Authors

1 PhD. student, Faculty of Management and Economics, Tarbiat Modares University, Tehran, Iran

2 Professor, Faculty of Management and Economics, Tarbiat Modares University, Tehran, Iran.

3 Associate Professor, Faculty of Management and Economics, Tarbiat Modares University, Tehran, Iran

4 Associate Professor, Department of Public Administration, Tehran University, Tehran, Iran.

Abstract

When decisions are made in uncertainty, robust analysis is a reliable method to evaluate the consequences of an initial decision during time. In this method sequential decisions would be implemented during a period of time and assessed. To establish robust analysis, we need to develop future scenarios and extract initial commitments which are more robust. Although it's abilities, robust analysis is a simple approach for gathering expert opinions and loses lots of information. The proposed model in this article, combines fuzzy screening phases with robust planning. The model here is then tested in a case study. In workshops six experts in Shiraz ED Co. cooperated to extract future scenarios, system configurations and needed commitments. Eventually by structuring the problem and evaluating this based on selected criteria, the desired configurations were specified. These configurations made the strategic solutions for logistics network for long term. The results show the combination of fuzzy screening and robust analysis can be used efficiently as a strategic planning framework for ambiguity and unstructured problems.

Keywords


[1]    Rosenhead J. )1978( "An education in robustness"; Journal of the Operational Research Society, 29: 105–11.
[2]    Rosenhead J., Mingers J., Translated By Azar A., Anvari A. )2013( Rational analysis for a problematic world revisited; Negah Danesh, Tehran, (in Persian).
[3]    Wong HY )1998( Making flexible planning decisions: Clarification and elaboration of the theory and methodology of robustness analysis.
[4]    Gupta SK, Rosenhead J. )1968( "Robustness in sequential investment decisions"; Management Science, 15(2): 8-18.
[5]    Rosenhead J. (1980) "Planning under uncertainty: I. The inflexibility of methodologies"; Journal of the Operational Research Society, 31: 209–16.
[6]    Rosenhead J. (1980) "Planning under uncertainty: II A methodology for robustness analysis"; Journal of the Operational Research Society, 31: 331-41.
[7]    Caplin D., Kornbluth J. (1980) "Multiple investment planning under uncertainty"; OMEGA, 3: p. 423–41.
[8]    Rosenhead J. (1981) "Operational research in urban planning"; Omega, 9(4): 345-364.
[9]    Best G., Partson G., Rosenhead J. (1986) "Robustness in practice-the regional planning of health services"; Journal of the Operational Research Society, 37: 463–78.
[10]  Weintraub A., Aboud J., Fernandez C., Laporte G., Ramirez E. (1999) "An emergency vehicle dispatching system for an electric utility in Chile"; Journal of the Operational Research Society, pp. 690-696.
[11]  Perrier N., Agard B., Baptiste P., Frayret JM, Langevin A., Pellerin R., et al. (2013) "A survey of models and algorithms for emergency response logistics in electric distribution systems"; Part I: Reliability planning with Fault considerations"; Computers & Operations Researc, 40 (7): 1895-1906.
[12]  Perrier N., Agard B., Baptiste P., Frayret JM, Langevin A., Pellerin R., et al. (2013) "A survey of models and algorithms for emergency response logistics in electric distribution systems. Part II: Contingency planning level; Computers & Operations Research, 40(7): 1907-1922.
[13]  Pereira J., Gomes LFAM, Paredes F. (2013) "Robustness analysis in a TODIM-based multicriteria evaluation model of rental properties"; Technological and Economic Development of Economy, 19 (sup1), p. S176-S190.
[14]  Govindan K., Fattahi M. (2015) "Investigating risk and robustness measures for supply chain network design under demand uncertainty: A case study of glass supply chain"; International Journal of Production Economics.
[15]  Namen AA, Bornstein CT, Rosenhead J. (2010) "The use of robustness analysis for planning actions in a poor Brazilian community"; Pesquisa Operacional, 30(2): 267-280.
[16]  Eustace D., Russell E. R., Landman E. D. (2003) "Application of robustness analysis for developing a procedure for better urban transportation planning decisions"; Journal of the Transportation Research Forum, 57(1): 107-121.
[17]  Hanafizadeh P., Arabi S., Hashemi A. (2006) "Robust strategic planning using scenario plannning and fuzzy inference system"; Journal of Management Reseaches In Iran (Modares Human Sciences), 46: 137-170. (in Persian).
[18]  Heidari E., DivSalar A. (2007) "Scenario planning, a tool for strategic evaluation"; Case of IRAN NanoTechnology Development. Fifth National Industrial Engineering Conference, Tehran. (in Persian).
[19]  Lashkarbolouki M., Khodad Hoseini S.H., Hoseini S. M., Hamidizadeh M. (2013) "Designing the prescriptive process model of robust strategy using mixed method"; Journal of Strategic Management Thought, 12: 121-151 (in Persian).
[20]  Kaplan RS, Norton DP. (2005) "The balanced scorecard: measures that drive performance"; Harvard business review, 83(7).
[21]  Ringland G. (2006) Scenario planning: Managing for the future Chichester; John Wiley & Sons.
[22]  Schwartz P. (1996) The art of the long view: paths to strategic insight for yourself and your company: Broadway Business.
[23]  Azar A., Faraji H. (2008) Fuzzy management science, IMPSC Pub, Tehran, (in Persian).
[24]  Yager RR. (1988) "On ordered weighted averaging aggregation operators in multi criteria decision making", In IEEE Transactions on Systems; Man and Cybernetics, Vol. 18, No. 1, pp. 183-190.
[25]  Pourezzat AA., Sodagar H. (2012) "Explaining the strategy formation process in public organizations active in the political arena of Islamic Repulic of Iran"; Management Reseaches In Iran, 16(2): 35-56, (in Persian).