[1] KazemZadeh, R., Sharif Mousavi, M., A fuzzy risk assessment model to evaluate risks in construction projects, Management Researches in Iran, 15 (1), 2012, 109-133.
[2] Hassanpour, A., NorRang, A., NabiZadeh, M., Modeling robust project schedule with limited resources and solve it using simulated annealing algorithm, Management Researches in Iran, 18(1), 2013, 1-24.
[3] Javanmardi, Sh., Qoddusi, P., Ashtehardian, E., The optimization of time-cost of the project considering resource limitation using genetic algorithm, 6th National Conference of Civil Engineering, University of Semnan, 2011.
[4] Fathi Hafshejani, K., Moghani, Qh., The new robust model in discrete time-cost trade-off problem, International Journal of Industrial Engineering and Production Management, 5(25), 2014, 2-14.
[5] Hafizoğlu, A.B., Discrete Time/Cost Trade-Off Problem in Project Scheduling, A Thesis Submitted To the Graduate School Of Natural and Applied Sciences of Middle East Technical University, 2007.
[6] Ebrahimnejad, S., Ahmadi, V., Javanshir, H., The balance of cost, time and quality in a CPM network using fuzzy logic and genetic algorithms, International Journal of Industrial Engineering and Production Management, 3(24), 2013, 376-362.
[7] De, .P.E., Dunne, J., Ghosh, J.B., Wells, C.E., Complexity of the Discrete Time/Cost Trade off Problem for Project Networks, Operations Research, 45, 1997, 302–306.
[8] Ben-Tal, A., El Ghaoui, L., Nemirovski, A., Robust Optimization, Princeton University Press, Princeton and Oxford, 2008.
[9] Ghafouri, S., TaghiZadeh Yazdi, M.R., A multi-objective mathematical model for project scheduling problem with resource constraints and solve it using metaheuristic simulated fireflies and refrigeration, Modern Researches in Decision Making, 4(1), 2016, 117-142.
[10] Bertsimas, D., Sim, M., Robust Discrete Optimization and Network Flows, Mathematical Programming, 98, 2003, 49-71.
[11] Bertsimas, J.B., Sim, M., The Price of Robustness. Operations Research, 52(1), 2004, 35-53.
[12] Benton, W.C., Quantity discount decision under conditions oF multiple items, multiple suppliers and resource limitation, International Journal of Production Economics, 27, 1999, 1953-1961.