[۱] Johnson, S.M., Optimal two‐and three‐stage production schedules with setup times included. Naval research logistics quarterly, 1954. 1(1): p. 61-68.
[۲] Nawaz, M., E.E. Enscore Jr, and I. Ham, A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega, 1983. 11(1): p. 91-95.
[۳] Abdel-Basset, M., et al., A hybrid whale optimization algorithm based on local search strategy for the permutation flow shop scheduling problem. Future Generation Computer Systems, 2018. 85.
[۴] Olfat, L., Total Tardiness Minimization in Flow Shop with Intermediate Due Dates, Modern Researches in Decision Making, 2017, 2(3): p. 25-47.
[۵] Lian, Z., X. Gu, and B. Jiao, A novel particle swarm optimization algorithm for permutation flow-shop scheduling to minimize makespan. Chaos, Solitons & Fractals, 2008. 35(5): p. 851-861.
[۶] Arthanary, T., An extension of two machine sequencing problem. Opsearch, 1971. 8: p. 10-22.
[۷] Lee, T. and Y. Loong, A review of scheduling problem and resolution methods in flexible flow shop. International Journal of Industrial Engineering Computations, 2019. 10(1): p. 67-88.
[۸] Fandel, G. and C. Stammen-Hegene, Simultaneous lot sizing and scheduling for multi-product multi-level production. International Journal of Production Economics, 2006. 104(2): p. 308-316.
[۹] Mohammadi, M., et al., Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups. Journal of Intelligent Manufacturing, 2010. 21(4): p. 501-510.
[۱۰] Babaei, M., M. Mohammadi, and S. Ghomi, A genetic algorithm for the simultaneous lot sizing and scheduling problem in capacitated flow shop with complex setups and backlogging. The International Journal of Advanced Manufacturing Technology, 2014. 70(1): p. 125-134.
[۱۱] Ramezanian, R., M. Saidi-Mehrabad, and E. Teimoury, A mathematical model for integrating lot-sizing and scheduling problem in capacitated flow shop environments. The International Journal of Advanced Manufacturing Technology, 2013. 66(1): p. 347-361.
[۱۲] Alaghebandha, M., et al., Modeling of Scheduling and Economic Lot Sizing In Distributed Permutation Flow Shops with Non-Identical Multi Factory, Modern Researches in Decision Making, 2018, 3(3): p. 129-155.
[۱۳] Badri, H.M., N.K. Khamis, and M.J. Ghazali, Integration of lot sizing and scheduling models to minimize production cost and time in the automotive industry. International Journal of Industrial Optimization, 2020. 1(1): p. 1-14.
[۱۴] Abdullah, S., A. Shamayleh, and M. Ndiaye. Capacitated lot-sizing and scheduling with sequence-dependent setups in petrochemical plants. in Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management, Kuala Lumpur, Malaysia. 2016.
[۱۵] Mirnajafizadeh, S.M. and M. Bijari, Robust simultaneous lot-sizing and scheduling with considering controllable processing time and fixed carbon emission in flow-shop environment. International Journal of Industrial and Systems Engineering, 2022. 40(3): p. 343-369.
[۱۶] Copil, K., et al., Simultaneous lotsizing and scheduling problems: a classification and review of models. OR spectrum, 2017. 39(1): p. 1-64.
[۱۷] Li, J.-q. and Q.-k. Pan, Solving the large-scale hybrid flow shop scheduling problem with limited buffers by a hybrid artificial bee colony algorithm. Information Sciences, 2015. 3(16): p. 487-502.
[۱۸] Xiang, L., Y. Ai-ling, and Z. Hui-yu. Buffer allocation optimization for flexible flow shop. in 2016 IEEE Information Technology, Networking, Electronic and Automation Control Conference. 2016.
[۱۹] Han, Z., et al., Hybrid flow shop scheduling with finite buffers. International Journal of Simulation and Process Modelling, 2018. 13(2): p. 156-166.
[۲۰] Lin, S., et al. Research on buffer dynamic capacity-increase scheduling method in flexible flow shop based on public buffer. in 10th International Conference on Modelling, Identification and Control (ICMIC). 2018.
[۲۱] Han, Z., et al., Flexible flow shop scheduling method with public buffer. Processes, 2019. 7(10): p. 681.
[۲۲] Fllah Sanami, S., et al, Concurrent scheduling and lot sizing in a flexible flow shop environment considering limited resources, Advances in Industrial Engineering, 2016. 17(50): p. 295-310.
[۲۳] Sang, H., L. Gao, and Q. Pan, Discrete artificial bee colony algorithm for lot-streaming flowshop with total flowtime minimization. Chinese journal of mechanical engineering, 2012. 25(5): p. 990-1000.
[۲۴] Karaboga, D., An idea based on honey bee swarm for numerical optimization. 2005, Technical report-tr06, Erciyes university, engineering faculty, computer .
[۲۵] Wang, L., Q.-K. Pan, and M.F. Tasgetiren, Minimizing the total flow time in a flow shop with blocking by using hybrid harmony search algorithms. Expert Systems with Applications, 2010. 37(12): p. 7929-7936.
[۲۶] Deng, G., H. Yang, and S. Zhang, An enhanced discrete artificial bee colony algorithm to minimize the total flow time in permutation flow shop scheduling with limited buffers. Mathematical Problems in Engineering, 2016.
[۲۷] Cui, Z. and X. Gu, An improved discrete artificial bee colony algorithm to minimize the makespan on hybrid flow shop problems. Neurocomputing, 2015. 148: p. 248-259.
[۲۸] Ghandi Bidgoli, S. and Karimi, F., A Simulation-Based Optimization Approach for Mixed model Two-sided Assembly Line Balancing with stochastic task times (Case Study: Beh Afarinan Datis Tiva Company), Journal of Industrial Engineering Research in Production Systems, 2020, 8(16): p. 199-213.
[۲۹] Ramezanian, R., M. Saidi-Mehrabad, and P. Fattahi, Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system. International Journal of Computer Integrated Manufacturing, 2013. 26(7): p. 681-695.